Development Schedule - Dates

Hi Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

Hope you had a great weekend. Have you had a chance to look over these development phases and give your best estimate of when each phase (and ideally, each feature you listed) will start? Having these dates will allow us to make sure your team has the templates they need when they are ready to start working on the features below.

Let me know if there is anything you need from me to better inform the development schedule.

ISLG Subscriber Site 
Phase 1:
1) Login & Registration flow
2) Subject navigator
3) Admin Settings
4) Terms & Phrases
5) Session Tracking
 
Phase 2:
6) Article Citator
7) Publication Citator
8) Jurisprudence Citator
9) Treaties & Rules
 
Phase 3:
10) Research Notepad
11) Notifications
12) Document View
13) Document Comparison 
14) Disputes & Dispute Documents
 
Phase 4:
15) Full Text Search 
16) Dashboard
 
ILG Subscriber Site
  1. Login & registration flow (No user stories related in target process)
  2. Search Filters
  3. Search/Browse Documents
  4. Research Notepad
  5. Document Comparison

Thanks Ketan!

Comments & Events

Ketan Sondarva, Technical Project Manager at DevIT
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

Please find below estimation for ISLG & ILG Subscriber site development plan and expecting design template before hand. As per our plan, we are expecting to start ILG Subscriber by 17th Feb, 2020 and ISLG Subscriber site by 24th Feb, 2020.

ILG Subscriber:
1) Login,Registration [by this weekend]
2) Search Browse Documents - [before 17th Feb, 2020]
3) Search Filters - [before 17th Feb, 2020]

ISLG Subscriber Site 
Phase 1:
2) Subject navigator - (by 21st Feb, 2020)
3) Admin Settings - (by 21st Feb, 2020)
4) Terms & Phrases - (by 21st Feb, 2020)
5) Session Tracking -(by 21st Feb, 2020)

Let me know for any further details.

Thanks,
Ketan
Savannah Mitchell, Project Manager at Industrial
Hey Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

I just responded to Jitesh Dhuravala, DevIT Jitesh regarding the ILG templates for login and registration. You should have everything you need.

For the search/browse documents and the search filters, this is a bit short notice for us (it is essentially 3 days to get the ILG templates done). We can provide these by end of day on Feb 19th and the remaining ISLG templates by Monday, Feb 24 instead of the Friday, Feb 21.

Could you please assign dates to the remaining templates listed? They do not have to be exact, but we need to know as far in advance as possible so we can properly plan. 

Thanks for your understanding. 

Savannah
Ketan Sondarva, Technical Project Manager at DevIT
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

Noted for ILG Templates and we will plan to work accordingly. For remaining template I will discuss with Jitesh & team and then can send you.

Thanks,
Ketan
Morgan Maguire, CEO
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

For the timelines above, are you considering the fact that we're building off the existing ILG HTML templates, and that there isn't as much work to get them completed by the 19th?

Also, I want to emphasize to everyone that the timelines on all tasks are fixed. I have zero tolerance for further delay, and you should consider how anything not delivered when needed will affect over the overall timeline. 

Thanks,

Morgan
Savannah Mitchell, Project Manager at Industrial
Hi Ketan Sondarva, Technical Project Manager at DevIT Ketan

We will be getting the ILG templates to you on Friday. The templates are slightly more complex and we require some extra time to build them properly. 

When you have a moment, could you please assign dates to the remaining phases?

Thanks Ketan.
Ketan Sondarva, Technical Project Manager at DevIT
Hi Savannah Mitchell, Project Manager at Industrial Savannah  

We are also expecting to get ISLG Phase1 templates on Friday as we have already discussed & finalized. please confirm so we can plan & start development accordingly. We will provide you estimated dates of remaining phases.

Thanks
Ketan
Jitesh Dhuravala, DevIT
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

As per your last comment, We should to get ILG templates on last Friday for phase 1 but we have not get it so please provide ILG templates so we can achieved development timelines which already defined.


Thanks,
Jitesh
Savannah Mitchell, Project Manager at Industrial
Hi Jitesh Dhuravala, DevIT Jitesh ,

I apologize for the delay, here are the templates:

Browse projects:

http://tologix-p3-inventory.s3-website.ca-central-1.amazonaws.com/front-end-search-filters.html (UI elements can be found on the first and second tabs)

Search Filters:

http://tologix-p3-inventory.s3-website.ca-central-1.amazonaws.com/front-end-search-filters.html (Orange overlay can be found by clicking the pencil in the sidebar)

Here are all the assets for both:



We will be finishing the ISLG phase 1 templates up today. 

Savannah
Morgan Maguire, CEO
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

I noticed in the templates above that we're still using a calendar selection that does not allow for manual dates to be entered, or does it allow for browsing by year.  This is something I've raised in the past: Problem with calendar selection fields - TOLOGIX - ISLG App Rebuild. Please ensure this is corrected for the templates above, and all future templates.

Thanks,

Morgan
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

We are remember that changes you have earlier requested for calendar allow manual dates selection and it allow browsing by year as well. We will do it from our side.

Savannah Mitchell, Project Manager at Industrial Savannah , following are dates and templates consider for next phase.

Phase-2:

1, Research Notepad  [ 28th Feb 2020 ]
2, Document Comparison  [ 2nd March 2020]

Thanks,
Jitesh
Morgan Maguire, CEO
Ok. Sounds good, Jitesh Dhuravala, DevIT Jitesh . However, Savannah Mitchell, Project Manager at Industrial Savannah please ensure future templates incorporate the appropriate requirements for calendar selection.

Thanks,

Morgan
Savannah Mitchell, Project Manager at Industrial
Hi Jitesh Dhuravala, DevIT Jitesh ,

Thanks for making the change to the calendar. Kev's progress so far on ISLG can be viewed here:

http://tologix-islg-subscribers.s3-website.ca-central-1.amazonaws.com/

All assets are attached here:




As we've mentioned before, we require more notice for templates. We can provide these to you by the end of next week (March 6th). With this new date and the fact that we need more notice in mind, can you please provide estimations of when you will need the remaining templates?

Thanks! 

Savannah
Ketan Sondarva, Technical Project Manager at DevIT
HI Savannah Mitchell, Project Manager at Industrial Savannah ,

Thanks for providing basic ISLG template which we can start to integrate as master page in ISLG Subscriber site from next week on wards as Team is busy with ISLG Admin Release on 29th Feb, 2020. More over, I would prefer to discuss this over call on Monday to finalize dates for phase 1 development templates. For rest modules we are working on estimation and by next weekend we should have estimated dates for you.

Thanks,
Ketan 
Savannah Mitchell, Project Manager at Industrial
OK sounds good Ketan Sondarva, Technical Project Manager at DevIT Ketan , talk to you Monday!
Morgan Maguire, CEO
Hi Ketan Sondarva, Technical Project Manager at DevIT Ketan and Savannah Mitchell, Project Manager at Industrial Savannah

Great to hear about the ISLG release on Monday. However, could you provide with an update on the completion of the ILG Admin site, which is due tomorrow? Note that my team is standing by to start testing the ILG application on Monday.

Note that I've setup a to-do group where we will be submitting our feedback: ILG Team Testing Feedback - TOLOGIX - Infrastructure LawGuide (ILG) for Tologix

Thanks,

Morgan
Savannah Mitchell, Project Manager at Industrial
Hi Morgan Maguire, CEO Morgan

There are currently no cards in UAT on ILG Admin. We will continue to prioritize testing on any cards that move into UAT. I believe there are 5 cards in testing right now. 

Savannah 
Morgan Maguire, CEO
Ok. Sounds good, Savannah Mitchell, Project Manager at Industrial Savannah .

Ketan Sondarva, Technical Project Manager at DevIT Ketan , I see a few cards In Testing:


Are these going to completed on Monday so that Industrial can perform UAT and get these moved to Done?

Morgan
 
Ketan Sondarva, Technical Project Manager at DevIT
Hi Morgan Maguire, CEO Morgan ,

We have put them in UAT in ILG site. Please review it and let us know for any further query.

Thanks,
Ketan
Morgan Maguire, CEO
Great. Thanks Ketan Sondarva, Technical Project Manager at DevIT Ketan .

Savannah Mitchell, Project Manager at Industrial Savannah , William Roberts, QA Manager at Industrial William and Naomi Joanis, UX Team Lead at Industrial Naomi , could you pleased prioritize getting the UAT complete on these cards, and then my team can begin examining the application.

Thanks,

Morgan
Savannah Mitchell, Project Manager at Industrial
No Problem Morgan Maguire, CEO Morgan , we will test the remaining cards before EOD today. 
Morgan Maguire, CEO
Great. Thanks Savannah Mitchell, Project Manager at Industrial Savannah . Please let me know when things are complete, and then I'll start taking a look, and prepare any questions I might have for our call tomorrow. 

Morgan
Morgan Maguire, CEO
Also, Savannah Mitchell, Project Manager at Industrial Savannah and Ketan Sondarva, Technical Project Manager at DevIT Ketan , when ILG is ready for delivery to my team, could you please ensure that all the content is wiped, so that we can work with clean site.

Also, I assume we've integrated a similar to document upload process to ISLG that will allow me to upload to following HTMLs to the system for the purposes of the SME trial (i.e., I'll be able to skip PDF conversion and upload the HTML directly):


Thanks,

Morgan
 
Morgan Maguire, CEO
Ok. Thanks Savannah Mitchell, Project Manager at Industrial Savannah .

Also, Ketan Sondarva, Technical Project Manager at DevIT Ketan and Melissa Cowell, General Manager at Industrial Melissa , could address my question above concerning the document upload process, and the ability to upload HTML documents directly, because I do not believe this is dealt with the in remaining cards.
 
Thanks,

Morgan 
Ketan Sondarva, Technical Project Manager at DevIT
Hi Morgan Maguire, CEO Morgan ,

As discussed with Jitesh, we have implemented document upload process as per P3. We will integrate new document upload process once Savannah provides us.

Thanks,
Ketan
Morgan Maguire, CEO
Ok. Thanks Ketan Sondarva, Technical Project Manager at DevIT Ketan ​.

Melissa Cowell, General Manager at Industrial Melissa ​, Can you join the call scheduled this morning so we can discuss this.

Thanks,

Morgan
Morgan Maguire, CEO
Hi Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

I spoke to Melissa Cowell, General Manager at Industrial Melissa , Savannah Mitchell, Project Manager at Industrial Savannah and William Roberts, QA Manager at Industrial William this morning, and let's proceed as follows:
  1.  Complete all the outstanding cards in TargetProcess for ILG admin as soon as possible:
  2. When ISLG admin is ready for delivery, Ketan Sondarva, Technical Project Manager at DevIT Ketan and Jitesh Dhuravala, DevIT Jitesh , please wipe the application of all content and data, and than manually upload the sample documents:
  3. Morgan Maguire, CEO Morgan , Paul Moon Paul and Irit Weinfeld Irit will perform testing and confirm that application is working as required. Any feedback will be submitted through to-do's here: ILG Team Testing Feedback - TOLOGIX - Infrastructure LawGuide (ILG) for Tologix, and will be assigned to Melissa Cowell, General Manager at Industrial Melissa and William Roberts, QA Manager at Industrial William
  4. Melissa Cowell, General Manager at Industrial Melissa and William Roberts, QA Manager at Industrial William , will triage the feedback, and if necessary submit bugs and requirements changes through TargetProcess. Any issues not deemed essential to the subject-matter expert (SME) trial will be deferred until after the SME trial is complete.
  5. When the ISLG admin application is ready for the SME trial , Ketan Sondarva, Technical Project Manager at DevIT Ketan and Jitesh Dhuravala, DevIT Jitesh , will move the application from http://dev.infrastructurelawguide.com/Admin to http://www.infrastructurelawguide.com/Admin, and the SME trial process will begin.
  6. Subsequent work on the ILG admin application (e.g., completing user management features, and dealing with the document upload issue above) will be performed on http://dev.infrastructurelawguide.com/Admin and then migrated to http://www.infrastructurelawguide.com/Admin after the SME trial is complete.
The timeline for these steps needs to be as follows:
  • Steps 1 and 2: completed on March 6th
  • Steps 3 and 4: completed on March 13th
  • Step 5: completed on March 16th
  • Step 6: completed by March 30th
Let me know if anyone has any questions or concerns with the above.

Thanks,

Morgan
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

All mentioned steps work fine except Step-2, We have already integrated PDF to HTML conversion algorithm in ILG and conversion working fine so there are no need to manual upload documents. Also your provided HTML files are simple HTML and there are not pinpoint references so document tagging does not work, document must be process by conversion algorithm in order to work further functionality in ILG.

In step-2, Admin need to upload PDF document and make start conversion than application convert into HTML rather than manual upload HTML. We have integrated conversion algorithm to convert PDF to HTML, There are only pending whole document process flow as per new approach and we will do once  Savannah Mitchell, Project Manager at Industrial Savannah  will provide us. Please provide your feedback and let us know.


Thanks,
Jitesh
Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh ,

I don't understand. The HTML documents above were coded according to the ILG coding manual: Manual PDF to HTML Conversion for ILG - TOLOGIX - PDF to HTML Conversion. How can they not have the structure required for the application?

Also, I tried converting the document with the PDF to HTML converter, and the results were not great. There is a lot of formatting issues that we'll need to resolved (see example below). 


As a result, I would like to use the HTML documents above, which were produced and vetted to be accurate representation of the original PDFs. How do you suggest we make that happen?

Similar to ISLG, I suspect a large number of documents will still need to be manual HTML coded, because of deficiencies in the automated converter, so we'll need to update the application (after the SME trial) to ensure these manually coded HTML can be uploaded to the system.

Thanks,

Morgan 
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

In ISLG & ILG, We can upload manually codded HTML into the system and it will also work but it must be generate based on manual which we have given to CDS team. but in step-2 you have given HTML documents used for P3 prototype and it is not accomplish current requirement of tagging, Current tagging approach and design needs HTML generation based on manual rules which we have provided to CDS team.

In P3 site, document tagging working as per third party JS (annotator.js) and after that industrial team provided document tagging JS which are totally different function logic and UI interface so based on document tagging logic P3 prototype HTML not will perform tagging functionality by current document tagging JS. We need to strictly follow conversion algorithm rules to build up HTML and that's why we are also prepared HTML coding manual document and give to CDS team to generate HTML as per mentioned instructions and rules.

But P3 prototype HTML documents are not accomplish all requirement of current document tagging approach.


Thanks.
Jitesh
Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh ,

Following up on the conversation this morning concerning the Herb Gray Parkway HTML documents, I'll have Irit Weinfeld Irit take a look at the documents you have uploaded to the ILG admin site, and we'll provide our feedback on adjustments that are needed to the HTMLs. The feedback will be provided as to-do's in the following to-do group: ILG PDF to HTML Conversion Tool Feedback - TOLOGIX - PDF to HTML Conversion

Note that I've created a separate to-do group, because I assume we will now be customizing the conversion tool specific to documents for ILG. However, if you believe we should consolidate feedback for the conversion tools in ISLG and ILG into one group of feedback, please let me know.

Also, I'm going to post a separate message about updating the relevant ILG HTML coding manual.

Thanks,

Morgan 
Irit Weinfeld
Hi Morgan,

Would you like me to go ahead and check the Herb Gray Parkway HTML documents tomorrow?
Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh and Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

Following up on my previous comment, Irit Weinfeld Irit is currently review all the Herb Gray Parkway HTML documents, and will provide her feedback in the following to-do group by the end of the day: ILG PDF to HTML Conversion Tool Feedback - TOLOGIX - PDF to HTML Conversion. Could you please ensure it's a high priority to implement the changes provided in her feedback to clean-up the documents and get them ready for the SME trial.

Also, Melissa Cowell, General Manager at Industrial Melissa completed UAT and sent two cards back to In Progress:


Please prioritize getting issues identified in these cards complete, and we'll complete the UAT process to get the ILG Admin application delivered according to the steps outlined above.

Thanks,

Morgan
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

Irit Weinfeld Irit can review that html, we have resolved that formatting issues of ILG documents which you have reported and discussed in last call and also updated in ILG Dev site.

All cards of ILG moved to done, only one card shifted to in process and that is related to message change, it will be done on Monday than there will not pending any card in ILG admin side.

Thanks,
Jitesh
Morgan Maguire, CEO
Ok. Sounds good, Jitesh Dhuravala, DevIT Jitesh .

Thanks,

Morgan 
Ketan Sondarva, Technical Project Manager at DevIT
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

Do we have any update on ISLG Phase 1 design templates? As of now, we just received master layout template only. Let us know by when we can get all phase 1 design templates so we can plan development accordingly.

Thanks,
Ketan
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

As per timeline specified for ILG, We have completed timeline of 6th March.

1, Completed all the outstanding cards in TargetProcess for ILG admin

2, All documents are upload on "Herb Gray Parkway" folder in Dev site of ILG.

Thanks,
Jitesh

Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh and Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

Ok. Great. As I've outlined in my post above: Re: Development Schedule - Dates - TOLOGIX - Infrastructure LawGuide (ILG) it appears we have completed Step 1: completing all cards on TargetProcess.

Next, step is resolve the issues with the Herb Gray Parkway documents that Irit Weinfeld Irit has identified in the following to-do list: ILG PDF to HTML Conversion Tool Feedback - TOLOGIX - PDF to HTML Conversion.

When these are resolved, we'll need to wipe the http://dev.infrastructurelawguide.com application of all data (with the exception of the Herb Gray Parkway documents), and then Irit Weinfeld Irit , and Paul Moon Paul and Morgan Maguire, CEO Morgan  can perform our testing of the application.

Note we have been using http://dev.infrastructurelawguide.com/Admin/Login.

Thanks,

Morgan
Morgan Maguire, CEO
Hi Savannah Mitchell, Project Manager at Industrial Savannah ,

Following-up on Ketan Sondarva, Technical Project Manager at DevIT Ketan 's comment above, what's the status of the ISLG Phase 1 templates? Looking through the comments, these were supposed to be delivered a couple of weeks ago.

Also, rather than continuing to track this through convoluted message threads, could you please organize and post ALL relevant templates (past & present) for the ILG and ISLG applications in the following Doc folders:

ISLG HTML Templates - TOLOGIX - ISLG App Rebuild

ILG HTML Templates - TOLOGIX - Infrastructure LawGuide (ILG) for Tologix

This needs to be better organized, and I'm concerned that we're posting important documents in message threads where they get lost.

Thanks,

Morgan
Savannah Mitchell, Project Manager at Industrial
Hi Morgan Maguire, CEO Morgan

Kev is entirely focused on finishing up these templates. We posted subject navigator here: 
subject-navigator.zip - TOLOGIX - ISLG App Rebuild

Kev is going to finish up the last few templates over the next day. 

Savannah
Morgan Maguire, CEO
OK. Great. Savannah Mitchell, Project Manager at Industrial Savannah . Also, would it be possible to upload the all previously completed templates that are relevant to the current applications. It would be good to have a record of these in case they need to be accessed in the future.

Thanks,

Morgan 
Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh and Ketan Sondarva, Technical Project Manager at DevIT Ketan ,

Now that we have completed ILG Admin and updated the SME trial sample documents:


We're ready to implement step-2 from above: Re: Development Schedule - Dates - TOLOGIX - Infrastructure LawGuide (ILG).

Please proceed with wiping all data from http://dev.infrastructurelawguide.com/Admin. Please confirm when the process is complete.

Thanks,

Morgan
 
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

Actually Morgan Maguire, CEO Morgan , we are ready to implement step-5. you are talking about step-2 but it is already done on March-6. Please confirm.

Thanks,
Jitesh
Morgan Maguire, CEO
Jitesh Dhuravala, DevIT Jitesh ​ , step-2 and 3 were never completed, because the SME sample documents were not ready. Please wipe all data from dev.ilg so that we can complete our testing and prepare the application for the SME trial.

Morgan
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

Ok, We are wipe all data from dev.ilg than for Herb Gray Parkway documents need to upload again so who will upload those document on dev.ilg. It will upload by SME or we need to upload those documents. 


Thanks,
Jitesh
Morgan Maguire, CEO
Hi Jitesh Dhuravala, DevIT Jitesh ,

Yes, please wipe dev.islg of all data, and then upload the Herb Grey Parkway documents, because there is currently no way for an admin user to manually upload HTML documents.

Thanks,

Morgan 
Jitesh Dhuravala, DevIT
Hi Morgan Maguire, CEO Morgan ,

We have wipe all data from dev.ilg, and also uploaded the Herb Grey Parkway documents. Please let us know anything need to do from our end in order to complete defined steps.


Thanks,
Jitesh
Morgan Maguire, CEO
Looks great Jitesh Dhuravala, DevIT Jitesh .

Irit Weinfeld Irit , Paul Moon Paul and I will start our testing. We'll submit any issues we find through the Basecamp to-do's and Melissa Cowell, General Manager at Industrial Melissa and William Roberts, QA Manager at Industrial William can triage them for TargetProcess.

When the process is complete and we've resolved any issues that are reported, we'll migrate dev.ilg to www.ilg, and start the SME trial.

Thanks,

Morgan