TOLOGIX - ISLG Public & Members Site Design

Meeting summary - Sept. 21, 2017 - ISLG re-design alignment call

Hi everyone,

Very nice chatting with you all today, and thank you Tiffany, Quietly Media Tiffany for sharing with us details on Quietly's process and what we can expect in the coming weeks.

As mentioned, below is a brief summary of what we covered, along with the rough timeline mentioned. Feel free to let me know if I missed anything or am off on any dates.

Thanks!
Stephen

Items discussed

- Team member introductions
- Quietly process walkthrough
- Division of labour, and deliverables
- Work on wireframes (Industrial) will begin once Content Layouts are provided (Quietly). Branding/strategy guide (Monolab) to be developed in parallel.
- Web copy guidance (estimated sizes, limitations etc.) to be provided to Industrial by Quietly.
- Industrial to work with DevIT to develop site based on final mockups

Timeline and key milestones

- Research and findings presentation: October 12th (Quietly)
- Content layouts: October 16th (Quietly)
- Wireframes: October 31st (Industrial)
- Branding/strategy guide: October 31st (Monolab)
- Web copy finalization: Mid-November TBC (Quietly)
- Mockups incorporating visual design: Mid-November TBC (Industrial)