Hello everyone,
Here is the recording from today's meeting, and here are the action items:
Here is the recording from today's meeting, and here are the action items:
-
, please update estimates on user stories/bug and to-do's based on discussions today and update the lists available on ISLG Rebuild and ILG Project Timelines with the relevant Development Completion Dates: https://docs.google.com/spreadsheets/d/1ArmqOfOLDeME0i1OzrnyueIDa6_Xam4P_nZ1ddv5dW8/edit#gid=0
Ketan
- Also, please ensure redundant estimates are eliminated from timelines (i.e., ensure estimates to do allocate time for both the applicable user story/bug and the to-do).
-
to provide more detailed requirements on proposed solution to duplicate references in the Article Citator, Jurisprudence Citator and Publication Citator: Re: Duplicate References in Jurisprudence Citator on the Rebuild Live Site - TOLOGIX - ISLG App Rebuild
Morgan
-
and
Jitesh
, please indicate which HTML documents have been added to the new ISLG application by inserting "1" into the applicable cells under column AJ (Uploaded to ISLG) in the ISLG HTML Coding List:
Harsh
and column X (Upload to ISLG) in the ISLG HTML Manual Coding list: -
and
Ketan
, please review technical requirements for integrating Sentry into the new ISLG application and determine whether there are red flags that would prevent us from implementing: Google Analytics Implementation - TOLOGIX - ISLG App Rebuild
Harsh
-
, please make any necessary updates to user stories, including https://industrialagency.tpondemand.com/restui/board.aspx?#page=userstory/21159 to accommodate the following:
Melissa
- Access to user management within legacy application will be maintained post-user synchronization with new application
- All changes to existing IP addresses will be manually updated within legacy application
-
and
Jitesh
, for ILG's February releases, please ensure time is allocated to merge the content between www.ilg and dev.islg before the end of the month.
Ketan
-
will create a to-do outlining the requirements for the content merge.
Morgan
-
Thanks,
Morgan
Morgan
I have updated which HTML documents have been added to the new ISLG application by inserting "1" into the applicable cells under column AJ (Uploaded to ISLG) in the Automated HTML coding list and column X (Upload to ISLG) in the Manual coding list.
Please check it and provide your feedback.
Thanks,
Jitesh
Thanks,
Morgan
Now that we've completed uploading batch 1, could you please mark completed documents in batches 2-6 based on their priority and
Thanks,
Morgan
We have uploaded batch 1 files to app.islg and also updated the latest date of the column "Upload to ISLG" into automated and manual sheet.
In batch-1 some files already in app.islg and some UIN entry not in app.islg.
The following UIN have already html file in app.islg.
Please check it and provide next batch to upload.
Thanks,
Jitesh
Please let me know how many pages or how many documents I can assign as Batch 2 upload.
Thank you,
Irit
We have ready to upload any number of pages or documents to upload in Batch 2. Please select document as per you guys need to upload in Batch 2, we are ready to upload html.
Thanks,
Jitesh
Let's move this into dedicate message thread going forward.
Also, regarding the documents
Morgan
Correct, those 9 files listed above should not have been included in the Batch. I had accidentally listed them as part of Batch 1 not realizing that they did not have entries in app.islg. These 9 files were sent for HTML conversion back in January 2021.
I can confirm that these 9 HTMLs have now been upload to app.islg.
Irit
As per
Batch HTML uploading to app.islg - TOLOGIX - PDF to HTML Conversion
Thank you,
Irit